Knowledge Base

September 26, 2025

Device Onboarding & Zero-Touch Provisioning (ZTP)

Objective Validate that a z40 can be brought under Director management via: Manual onboarding from the Onboard List Page, and Zero Touch Secure Provisioning via the AmZetta Provision Server (MSP-driven). Confirm […]
September 26, 2025

Event Logging & Syslog Integration (Live)

Objective Demonstrate that the z40 Gateway Router and Director: Generate live event logs for security and system activities. Display those logs in Director in near real-time. […]
September 26, 2025

Real-Time Traffic Analytics & Flow Monitoring

Objective Demonstrate live visibility at both the Director (global) and device (z40) level by verifying: Real-time bandwidth by edge controller and per-client Live Top Applications / Domains Live per-interface rates/counters […]
September 26, 2025

Firmware Upgrade & Config Backup/Restore

Validate that the z40 Gateway Router can: Upgrade firmware through the Director UI once the firmware package is staged. Roll back to a last-known-good firmware image […]
September 26, 2025

VLAN & Layer-2 Bridging

Objective Validate that the zWAN Gateway Router can: Create a tagged VLAN on a LAN interface and serve DHCP on that VLAN. Bridge a VLAN interface […]
September 26, 2025

IP Routing & Static Route Steering (z40 Branch)

Objective Prove that static routes on the zWAN/z40 can intentionally steer traffic—independent of defaults—by: Splitting Internet egress across WAN00 and WAN04 (5G) with two /1 routes, […]
September 26, 2025

SaaS & Internet Breakout Validation

Objective Verify that the branch z40 routes: Non-SaaS internet traffic through the tunnels (backhauled to the concentrator), and SaaS applications directly out the branch WAN (no backhaul), using the Net Balancer’s Branches and SAAS APPS tabs, […]